{"id":1373,"date":"2026-10-31T10:56:16","date_gmt":"2026-10-31T02:56:16","guid":{"rendered":"https:\/\/lyuandassociates.com\/beijing\/hktdc-sourcing-what-to-do-when-a-supplier-delivers-defective-or-non-conforming-goods\/"},"modified":"2026-10-31T10:56:17","modified_gmt":"2026-10-31T02:56:17","slug":"hktdc-sourcing-what-to-do-when-a-supplier-delivers-defective-or-non-conforming-goods","status":"publish","type":"post","link":"https:\/\/lyuandassociates.com\/beijing\/hktdc-sourcing-what-to-do-when-a-supplier-delivers-defective-or-non-conforming-goods\/","title":{"rendered":"HKTDC Sourcing: What to Do When a Supplier Delivers Defective or Non-Conforming Goods"},"content":{"rendered":"\n<!-- BCL_CITY_OPENING_START -->\n<section class=\"bcl-city-opening\"><p><strong>Beijing is a relevant commercial location for international buyers sourcing from China.<\/strong> Beijing is primarily a technology, engineering and business center, while also serving as a base for industrial and equipment-related businesses. A dispute involving a supplier in this market should be considered in light of both the contractual relationship and the practical characteristics of the local supply chain.<\/p><\/section>\n<!-- BCL_CITY_OPENING_END -->\n\n\n\r\n\r\n\r\n\r\n\r\n<p class=\"hk-lead wp-block-paragraph\">Finding a supplier on hktdc.com Sourcing doesn&#8217;t mean the transaction is backed by anyone. When a shipment arrives wrong, what decides whether you have a claim is the <strong>evidence you gather in the first 72 hours<\/strong> and the <strong>first notice you put in writing<\/strong>.<\/p>\r\n\r\n\r\n\r\n<div class=\"hk-disclaimer\"><strong>Start with the platform&#8217;s real role.<\/strong> HKTDC&#8217;s <em>Terms of Use<\/em> state that HKTDC &#8220;does not endorse, warrant or guarantee&#8221; any material, product or service made available through the platform, is <strong>not a party to any transaction between you and any third party<\/strong>, and the information is for reference only \u2014 use it at your own risk.\r\n<span class=\"hk-disclaimer-note\">This is a buyer&#8217;s practice guide, not legal advice. For a material claim or anything approaching a standoff, have counsel review the actual contract before you escalate.<\/span><\/div>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">1. Name the breach before you touch anything<\/h3>\r\n\r\n\r\n\r\n<table class=\"hk-table\">\r\n<thead>\r\n<tr>\r\n<th>Type of failure<\/th>\r\n<th>What you must prove<\/th>\r\n<th>Typical examples<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Manufacturing defect<\/strong><\/td>\r\n<td>Production diverged from the agreed standard<\/td>\r\n<td>Cracks, wrong material, missing parts, bad welds or stitching<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Specification non-conformity<\/strong><\/td>\r\n<td>Goods differ from the spec, drawing or approved sample<\/td>\r\n<td>Wrong dimensions, colour, grade, rating or capacity<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Quantity \/ packing error<\/strong><\/td>\r\n<td>Count, SKU, label or lot code diverges from the PO<\/td>\r\n<td>Short ship, mixed load, no carton marks, missing manuals<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Performance failure<\/strong><\/td>\r\n<td>The product doesn&#8217;t do what was specified or warranted<\/td>\r\n<td>Machine runs at 60% of promised output; life-cycle test fails<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Certification \/ compliance failure<\/strong><\/td>\r\n<td>The product can&#8217;t lawfully be sold in the destination market<\/td>\r\n<td>No CE \/ UKCA \/ FCC, doctored test report, no DoC<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n\r\n\r\n\r\n\r\nThe fight is never really about whether the product &#8220;looks bad&#8221;. It&#8217;s about whether the goods conform to <strong>the standard the supplier agreed to<\/strong>. Compliance failure is the most expensive kind: a certificate issued <em>after<\/em> delivery doesn&#8217;t cure an imported or already-listed product. Re-check the destination rules before you agree to any discount.\r\n\r\n\r\n\r\n\r\n<div class=\"hk-callout hk-callout--stop\"><strong>First move on finding a defect: touch nothing.<\/strong> Don&#8217;t use, resell, repackage, rework or return the goods. Using them can read as acceptance; returning them without documentation destroys your best exhibits.<\/div>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">2. The 72-hour evidence file<\/h3>\r\n\r\n\r\n\r\n<ul class=\"hk-check wp-block-list\">\r\n \t<li><strong>The agreement file<\/strong> \u2014 PO, proforma \/ commercial invoice, the exact quoted version, spec sheet &amp; drawings, the <span class=\"hk-em\">sealed approved sample (dated, signed by both sides, marked &#8220;approved for production&#8221;)<\/span>, and every certification requirement written into the order.<\/li>\r\n \t<li><strong>The arrival file<\/strong> \u2014 wide-angle then close-up shots of outer cartons and pallets with <strong>carton numbers and lot codes legible<\/strong>; continuous unboxing video showing intact seals; delivery note, packing list, B\/L or AWB, customs entry. Timestamp everything and put the inspection date in the file name.<\/li>\r\n \t<li><strong>The measurement file<\/strong> \u2014 defect rate as &#8220;<span class=\"hk-email__fill\">X of Y units<\/span>&#8220;, mapped to carton and lot; measured value vs. tolerance (e.g. &#8220;spec 100.00 \u00b10.05 mm; measured 100.18 mm&#8221;). For safety-critical or contested goods, commission an <strong>independent third-party inspection<\/strong> and keep the method, sample size, who drew the samples and the invoice \u2014 this is the single most persuasive document you can produce.<\/li>\r\n \t<li><strong>The communication file<\/strong> \u2014 export the whole HKTDC Message Centre thread. Confirm which <strong>legal entity signed the contract and which received the payment<\/strong>; a storefront or brand name on a profile is not necessarily your contracting party.<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p class=\"hk-tip wp-block-paragraph\">\ud83d\udca1 HKTDC trust labels (Gold \/ Silver \/ Bronze) are scored on company &amp; document verification, exhibition history, average response time and similar signals. They are a <strong>screening aid, not a warranty that this batch is good<\/strong>. The verification partners check whether records (e.g. a T\u00dcV Rheinland certificate, a D&amp;B entity report) are genuine \u2014 not whether the carton in front of you was made to spec.\n\n<!-- BCL_CITY_MIDDLE_START -->\n<section class=\"bcl-city-context\"><h3>Local Supply Chain Risks in Beijing<\/h3><p>International buyers dealing with Beijing companies may be sourcing products or services connected with technology, engineering, equipment and business services. Typical issues may include technology contract disputes, engineering disputes, service-performance disputes and payment disputes. For technology, engineering and business-service transactions, buyers should pay particular attention to the contractual scope of work, acceptance standards, intellectual-property terms, payment milestones and the legal identity of the service provider.<\/p><p>Beijing is located in Beijing and is supported by major technology, engineering, corporate and professional-service networks. For cross-border transactions, this background can be useful when assessing supplier verification, contract enforcement and dispute-resolution options.<\/p><\/section>\n<!-- BCL_CITY_MIDDLE_END -->\n<\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">3. The clock: notify properly, and say what&#8217;s wrong<\/h3>\r\n\r\n\r\n\r\n\r\nIf the contract sets an inspection or claims window \u2014 commonly 7, 14 or 30 days from arrival \u2014 that window usually controls. <strong>If the contract is silent, you still don&#8217;t get to wait.<\/strong> Where the CISG applies (the default regime for many China\u2013HK\u2013rest-of-world sales):\r\n\r\n\r\n\r\n\r\n<table class=\"hk-table hk-table--compact\">\r\n<tbody>\r\n<tr>\r\n<td>Art. 38<\/td>\r\n<td>Examine the goods within as short a period as practicable; where the contract involves carriage, examination may be deferred until the goods reach their destination.<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Art. 39(1)<\/td>\r\n<td>Notify the seller within a reasonable time after discovery, <strong>specifying the nature of the non-conformity<\/strong>, or you lose the right to rely on it.<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Art. 39(2)<\/td>\r\n<td>In any event, the cut-off is <strong>two years from actual delivery<\/strong>, unless a contractual guarantee says otherwise.<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Art. 40<\/td>\r\n<td>If the seller knew \u2014 or could not have been unaware \u2014 of the defect and said nothing, it can&#8217;t hide behind the notice rules.<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n\r\n\r\n\r\n\r\nTwo mistakes that cost more claims than anything else: (1) writing &#8220;quality problem, the customer is complaining&#8221; \u2014 that is <em>not<\/em> valid notice; you must name the nature of <em>each<\/em> defect, and a notice about one defect doesn&#8217;t preserve you on another; (2) waiting until the lab report is finished. Send a short &#8220;non-conformity discovered, details to follow&#8221; letter first to stop the clock, then attach the report.\r\n\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">4. The first Claim Notice \u2014 copy, fill, send<\/h3>\r\n\r\n\r\n\r\n<div class=\"hk-email\">\r\n<div class=\"hk-email__subject\">Subject: Quality Claim Notice \u2014 PO #<span class=\"hk-email__fill\">[number]<\/span> \u00b7 Invoice #<span class=\"hk-email__fill\">[number]<\/span> \u00b7 <span class=\"hk-email__fill\">[product]<\/span> \u00b7 arrived <span class=\"hk-email__fill\">[date]<\/span><\/div>\r\n<div class=\"hk-email__body\">\r\n\r\nDear <span class=\"hk-email__fill\">[supplier quality contact]<\/span>,\r\n\r\nWe are formally notifying you that the goods delivered under PO #<span class=\"hk-email__fill\">[number]<\/span> (Invoice #<span class=\"hk-email__fill\">[number]<\/span>, B\/L or AWB #<span class=\"hk-email__fill\">[number]<\/span>, arrived <span class=\"hk-email__fill\">[date]<\/span>) do not conform to the agreed specifications.\r\n\r\n<strong>Nature of non-conformity:<\/strong> <span class=\"hk-email__fill\">[e.g. housing dimension measured at 100.18 mm against spec 100.00 \u00b10.05 mm (Spec Rev. 3, cl. 2.1); in addition X\/Y units show cracks \/ wrong material \/ missing components \u2014 see attached inspection report]<\/span>.\r\n\r\n<strong>Affected quantity:<\/strong> <span class=\"hk-email__fill\">[X]<\/span> units of <span class=\"hk-email__fill\">[Y]<\/span>, cartons <span class=\"hk-email__fill\">[range]<\/span>, lot <span class=\"hk-email__fill\">[number]<\/span>.\r\n\r\n<strong>Basis:<\/strong> <span class=\"hk-email__fill\">[contract cl. X \/ sealed approved sample dated __ \/ certification requirement]<\/span>. Photographs, unboxing video, packing list and the independent inspection report are attached as Exhibits A\u2013D.\r\n\r\nWe are placing the affected goods and the balance of this shipment <strong>on hold and sealed<\/strong>, pending your written corrective-action proposal. Please confirm receipt and provide your proposal \u2014 including remedy, collection \/ return arrangements, and allocation of freight, duties, storage, re-inspection and downstream costs \u2014 by <strong><span class=\"hk-email__fill\">[date, 7\u201314 business days]<\/span><\/strong>.\r\n\r\nThis notice is issued without prejudice to all rights and remedies available to us under the contract and applicable law, all of which are expressly reserved.\r\n\r\nYours faithfully,\r\n<span class=\"hk-email__fill\">[name, title]<\/span>\r\n<span class=\"hk-email__fill\">[company \u00b7 email \u00b7 phone]<\/span>\r\n\r\n<\/div>\r\n<\/div>\r\n\r\n\r\n\r\n\r\nNote what it deliberately <em>doesn&#8217;t<\/em> do: no &#8220;scam&#8221; language, no lawyer threats, and no &#8220;we accept a replacement&#8221;. That comes later, in writing, with conditions attached.\r\n\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">5. Pick the remedy that actually unsticks the project<\/h3>\r\n\r\n\r\n\r\n<table class=\"hk-table\">\r\n<thead>\r\n<tr>\r\n<th>Remedy<\/th>\r\n<th>Best for<\/th>\r\n<th>Lock it down in writing<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td><strong>Sort \/ rework at supplier&#8217;s cost<\/strong><\/td>\r\n<td>Wrong labels, minor packing, a separable cosmetic fault<\/td>\r\n<td>Who does it, where, by when; re-inspection method; no loss of warranty or certification<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Replacement<\/strong><\/td>\r\n<td>Safety, function, compliance or brand-critical failure<\/td>\r\n<td>Qty + spec + date + <strong>who pays freight, duties, removal, storage, re-install<\/strong> + what if the replacement also fails<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Price reduction \/ credit<\/strong><\/td>\r\n<td>Minor, safely usable deviation you&#8217;re keeping<\/td>\r\n<td>Exact amount, affected units only, which invoice it&#8217;s applied to \u2014 <em>not<\/em> worded as &#8220;full and final settlement&#8221;<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Refund + return<\/strong><\/td>\r\n<td>Goods unusable, trust gone, deadline blown<\/td>\r\n<td>Return instructions, collection at their cost, refund timeline, storage accrual<\/td>\r\n<\/tr>\r\n<tr>\r\n<td><strong>Cover purchase<\/strong><\/td>\r\n<td>You must have stock <em>now<\/em><\/td>\r\n<td>Act in good faith and without unreasonable delay; keep every quote and invoice \u2014 the price differential and incidental costs are only recoverable if proved<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n\r\n\r\n\r\n\r\nA split solution is often the smartest: keep and discount the usable portion, air-freight compliant replacements for the rest, claim the extra freight. Holding out for an all-or-nothing refund can cost more than the defect itself.\r\n\r\n\r\n\r\n\r\n<div class=\"hk-callout hk-callout--go\"><strong>If money is still unpaid:<\/strong> check the payment schedule, the inspection conditions and any set-off clause <em>before<\/em> you withhold. If final payment is contractually tied to successful inspection, the report is your best friend. If it isn&#8217;t, unilaterally holding back unrelated sums can turn the supplier&#8217;s quality breach into <em>your<\/em> payment breach.<\/div>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">6. When the supplier pushes back \u2014 answer with the standard, not the tone<\/h3>\r\n\r\n\r\n\r\n<table class=\"hk-table\">\r\n<thead>\r\n<tr>\r\n<th>Their line<\/th>\r\n<th>Your answer<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>&#8220;Our QC report says passed.&#8221;<\/td>\r\n<td>&#8220;Please share the standard, method, sample size, lot tested and who signed it. It will be assessed against the standard <strong>we<\/strong> agreed in clause [X].&#8221;<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>&#8220;This is normal manufacturing tolerance.&#8221;<\/td>\r\n<td>&#8220;Agreed tolerance is \u00b10.05 mm. Measured value is 100.18 mm. The question isn&#8217;t whether the difference looks small.&#8221;<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>&#8220;You accepted at pre-shipment inspection.&#8221;<\/td>\r\n<td>&#8220;Pre-shipment inspection was a production checkpoint, not a waiver of conformity under the contract \/ CISG Art. 36.&#8221;<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>&#8220;We&#8217;ll handle it.&#8221;<\/td>\r\n<td>&#8220;Please confirm in writing: remedy, quantities, collection date, cost allocation and re-inspection. A verbal undertaking isn&#8217;t accepted.&#8221;<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>&#8220;Return everything and we&#8217;ll check.&#8221;<\/td>\r\n<td>&#8220;Goods will be held at your risk and expense pending agreement. Return of sealed representative samples only, against a joint inventory.&#8221;<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n\r\n\r\n\r\n\r\nIf the contract has an <strong>arbitration clause<\/strong>, name it early and correctly \u2014 it may be your only available forum, and the wrong court won&#8217;t help. No clause? The governing law and the supplier&#8217;s actual legal entity determine where you can sue and whether recovery is realistic.\r\n\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">7. Escalation ladder<\/h3>\r\n\r\n\r\n\r\n<ol class=\"hk-steps\">\r\n \t<li><strong>Report to HKTDC Sourcing Support.<\/strong> Ask the platform to review the supplier&#8217;s conduct. It can affect trust indicators and may open mediation, but it is <em>not<\/em> a court and won&#8217;t auto-refund you or award damages.<\/li>\r\n \t<li><strong>Formal demand letter<\/strong> \u2014 ideally bilingual, built on the actual contract and evidence, stating the claim, the remedy and the deadline.<\/li>\r\n \t<li><strong>Mediation \/ arbitration<\/strong> under the dispute-resolution clause. For material sums, engage cross-border China counsel <em>before<\/em> committing to a tribunal.<\/li>\r\n \t<li><strong>Litigation<\/strong> \u2014 only after weighing claim value against legal cost, the defendant&#8217;s assets and enforceability. Winning a judgment and collecting it are two different jobs.<\/li>\r\n<\/ol>\r\n\r\n\r\n\r\n\r\nHKTDC&#8217;s own terms make the same point from the other side: the platform&#8217;s job is connection, communication and information. The commercial claim runs between you and the supplier.\r\n\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">8. The 10-minute fix for the next PO<\/h3>\r\n\r\n\r\n\r\n<ul class=\"hk-check wp-block-list\">\r\n \t<li>Ask the questions HKTDC&#8217;s own enquiry form prompts for: <strong>&#8220;What is your warranty \/ after-sales policy?&#8221;<\/strong> and <strong>&#8220;Can you provide relevant certifications or test reports?&#8221;<\/strong><\/li>\r\n \t<li>Turn the approved sample into a <strong>signed, dated, sealed reference<\/strong> that buyer, factory and inspector each hold a copy of.<\/li>\r\n \t<li>Write the top five reject-critical items into the spec <strong>and<\/strong> the pre-shipment inspection checklist \u2014 material, dimension, colour, performance, certification.<\/li>\r\n \t<li>Name the inspection point, the tolerance, the claims window and the remedy <em>in the PO itself<\/em>.<\/li>\r\n \t<li>Agree who pays what when it goes wrong \u2014 <strong>before<\/strong> it goes wrong.<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\">Final word<\/h3>\r\n\r\n\r\n\r\n\r\nA defective shipment isn&#8217;t a customer-service issue. It&#8217;s a contract-performance dispute, and the first 72 hours decide whether you have a claim or just a story.\r\n\r\n\r\n\r\n\r\n<blockquote class=\"hk-quote is-layout-flow wp-block-quote-is-layout-flow\">Document the gap between what was promised and what arrived. Notify in writing, naming every defect. Keep the leverage \u2014 unpaid balance, held goods, clean evidence \u2014 until the remedy is signed, delivered <em>and re-inspected<\/em>.<\/blockquote>\r\n\r\n\r\n\r\n\r\n<strong>Need the next piece?<\/strong> Tell me the product category (machinery, furniture, building materials, electronics, garments\u2026) and your Incoterm, and I&#8217;ll tailor the notice, the defect-to-spec evidence table and the remedy ladder to that exact deal.\r\n\r\n\r\n\r\n\n\n<!-- BCL_CITY_CLOSING_START -->\n<section class=\"bcl-city-closing\"><h3>Resolving a Supplier Dispute in Beijing<\/h3><p class=\"wp-block-paragraph\">Where a commercial dispute has developed, an overseas buyer should avoid relying solely on informal communications. Reviewing the contract, identifying the correct legal entity, preserving documentary evidence and assessing the available dispute-resolution mechanism are usually important before deciding how to proceed.<\/p><p>The appropriate legal strategy depends on the specific transaction, the supplier\u2019s conduct, the evidence available and the applicable legal framework.<\/p><\/section>\n<!-- BCL_CITY_CLOSING_END -->\n","protected":false},"excerpt":{"rendered":"<p>Beijing is a relevant commercial location for international buyers sourcing from China. Beijing is primarily a technology, engineering and business center, while also serving as&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[],"class_list":["post-1373","post","type-post","status-publish","format-standard","hentry","category-hktdc-dispute-lawyers"],"_links":{"self":[{"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/posts\/1373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/comments?post=1373"}],"version-history":[{"count":0,"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/posts\/1373\/revisions"}],"wp:attachment":[{"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/media?parent=1373"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/categories?post=1373"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lyuandassociates.com\/beijing\/wp-json\/wp\/v2\/tags?post=1373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}