{"id":1328,"date":"2026-10-06T11:36:17","date_gmt":"2026-10-06T11:36:17","guid":{"rendered":"https:\/\/lyuandassociates.com\/ningbo\/china-steel-supplier-dispute-non-conforming-products-and-contract-claims\/"},"modified":"2026-10-06T11:36:18","modified_gmt":"2026-10-06T11:36:18","slug":"china-steel-supplier-dispute-non-conforming-products-and-contract-claims","status":"publish","type":"post","link":"https:\/\/lyuandassociates.com\/ningbo\/china-steel-supplier-dispute-non-conforming-products-and-contract-claims\/","title":{"rendered":"Ningbo Steel Supplier Dispute: Non-Conforming Products and Contract Claims"},"content":{"rendered":"<p><!-- BCL_CITY_OPENING_START --><\/p>\n<section class=\"bcl-city-opening\">\n<p><strong>Supplier verification is particularly important for overseas buyers dealing with companies in Ningbo.<\/strong> Ningbo is a major port and manufacturing center with extensive export-oriented industrial supply chains. The buyer should distinguish the commercial location of a supplier from the legal identity of the entity that actually signed the contract and received the payment.<\/p>\n<\/section>\n<p><!-- BCL_CITY_OPENING_END --><\/p>\n<p>China is one of the world&#8217;s largest producers and exporters of steel products. Foreign companies regularly purchase steel materials from Chinese suppliers, including steel plates, coils, pipes, bars, stainless steel products, structural steel, and customized steel components.<\/p>\n<p>Most transactions proceed smoothly. However, disputes may arise when the delivered steel products do not comply with the agreed specifications, quality standards, quantity requirements, or contractual obligations.<\/p>\n<p>For foreign buyers, a China steel supplier dispute is often not simply a quality complaint. It may involve complex issues including:<\/p>\n<ul>\n<li>Contract interpretation<\/li>\n<li>Product specifications<\/li>\n<li>Material certificates<\/li>\n<li>Inspection standards<\/li>\n<li>Shipment documents<\/li>\n<li>Payment obligations<\/li>\n<li>Rejection of goods<\/li>\n<li>Refund claims<\/li>\n<li>Damages<\/li>\n<li>Litigation or arbitration in China<\/li>\n<\/ul>\n<p>The key question is:<\/p>\n<p><strong>What legal options does a foreign buyer have when a Chinese steel supplier delivers non-conforming products?<\/strong><\/p>\n<p>The answer depends on the contract terms, technical requirements, evidence available, and the seriousness of the supplier&#8217;s breach.<\/p>\n<h3>1. Common Types of China Steel Supplier Disputes<\/h3>\n<p>Steel transactions often involve strict technical requirements. A supplier may breach the contract in many ways, including:<\/p>\n<ul>\n<li>Steel grade does not match the contract<\/li>\n<li>Chemical composition exceeds permitted limits<\/li>\n<li>Mechanical properties fail testing<\/li>\n<li>Thickness or dimensions are incorrect<\/li>\n<li>Surface quality does not meet requirements<\/li>\n<li>Quantity is short<\/li>\n<li>Steel products are damaged during transportation<\/li>\n<li>Material certificates are inaccurate or incomplete<\/li>\n<li>Products fail customer inspection<\/li>\n<li>Supplier delivers different materials without approval<\/li>\n<li>Supplier refuses replacement<\/li>\n<li>Supplier refuses refund<\/li>\n<li>Delivery is significantly delayed<\/li>\n<\/ul>\n<p>For example, a buyer may order:<\/p>\n<ul>\n<li>ASTM A36 steel plates<\/li>\n<li>Stainless steel 304 sheets<\/li>\n<li>API standard steel pipes<\/li>\n<li>High-strength structural steel<\/li>\n<li>Customized steel parts<\/li>\n<\/ul>\n<p>but receive products that do not meet the agreed specifications.<\/p>\n<h3>2. Why Steel Product Disputes Are Technically Complex<\/h3>\n<p>Steel products are usually evaluated through technical standards rather than appearance alone.<\/p>\n<p>A product may look acceptable but fail because of:<\/p>\n<ul>\n<li>Incorrect chemical composition<\/li>\n<li>Insufficient tensile strength<\/li>\n<li>Incorrect hardness<\/li>\n<li>Poor corrosion resistance<\/li>\n<li>Incorrect heat treatment<\/li>\n<li>Wrong steel grade<\/li>\n<li>Manufacturing defects<\/li>\n<\/ul>\n<p>Therefore, a dispute often requires technical evidence.<\/p>\n<p>Important documents may include:<\/p>\n<ul>\n<li>Purchase contract<\/li>\n<li>Technical specification<\/li>\n<li>Product drawings<\/li>\n<li>Quality requirements<\/li>\n<li>Inspection standards<\/li>\n<li>Material certificates (Mill Test Certificates)<\/li>\n<li>Laboratory test reports<\/li>\n<li>Shipping documents<\/li>\n<li>Photos and videos<\/li>\n<li>Communication records<\/li>\n<\/ul>\n<p>The buyer must prove the difference between:<\/p>\n<p><strong>What was contractually promised<\/strong><\/p>\n<p>and<\/p>\n<p><strong>What was actually delivered.<\/strong><\/p>\n<h3>3. Review the Contract and Technical Specifications First<\/h3>\n<p>Many foreign buyers focus on the supplier&#8217;s explanation after receiving defective steel products.<\/p>\n<p>However, the first question should be:<\/p>\n<p><strong>What exactly did the supplier agree to provide?<\/strong><\/p>\n<p>Important contract terms include:<\/p>\n<h3>Product description<\/h3>\n<p>For example:<\/p>\n<ul>\n<li>Steel grade<\/li>\n<li>Standard number<\/li>\n<li>Size<\/li>\n<li>Thickness<\/li>\n<li>Length<\/li>\n<li>Weight<\/li>\n<li>Tolerance<\/li>\n<li>Surface requirements<\/li>\n<\/ul>\n<h3>Quality requirements<\/h3>\n<p>For example:<\/p>\n<ul>\n<li>ASTM standards<\/li>\n<li>EN standards<\/li>\n<li>JIS standards<\/li>\n<li>GB standards<\/li>\n<li>Customer-specific requirements<\/li>\n<\/ul>\n<h3>Inspection requirements<\/h3>\n<p>Including:<\/p>\n<ul>\n<li>Inspection method<\/li>\n<li>Inspection location<\/li>\n<li>Testing laboratory<\/li>\n<li>Acceptance criteria<\/li>\n<li>Sampling method<\/li>\n<\/ul>\n<h3>Delivery requirements<\/h3>\n<p>Including:<\/p>\n<ul>\n<li>Delivery date<\/li>\n<li>Shipping terms<\/li>\n<li>Packaging requirements<\/li>\n<li>Documents required<\/li>\n<\/ul>\n<p>A detailed contract can significantly improve the buyer&#8217;s position in a dispute.<\/p>\n<h3>4. Non-Conforming Steel Products: What Does It Mean?<\/h3>\n<p>A steel product may be considered non-conforming when it fails to meet contractual requirements.<\/p>\n<p>Examples include:<\/p>\n<h3>Wrong steel grade<\/h3>\n<p>The buyer orders:<\/p>\n<blockquote><p>Stainless Steel 316<\/p><\/blockquote>\n<p>but receives:<\/p>\n<blockquote><p>Stainless Steel 304.<\/p><\/blockquote>\n<p>Even if the products appear similar, the difference may affect corrosion resistance and intended use.<\/p>\n<h3>Incorrect chemical composition<\/h3>\n<p>Steel quality depends heavily on chemical composition.<\/p>\n<p>For example:<\/p>\n<ul>\n<li>Carbon content<\/li>\n<li>Chromium content<\/li>\n<li>Nickel content<\/li>\n<li>Molybdenum content<\/li>\n<\/ul>\n<p>If the composition does not meet the agreed standard, the buyer may have a quality claim.<\/p>\n<h3>Failure of mechanical testing<\/h3>\n<p>Steel may fail tests relating to:<\/p>\n<ul>\n<li>Tensile strength<\/li>\n<li>Yield strength<\/li>\n<li>Elongation<\/li>\n<li>Hardness<\/li>\n<li>Impact resistance<\/li>\n<\/ul>\n<p>Such failures can affect whether the material can safely be used.<\/p>\n<h3>Incorrect dimensions<\/h3>\n<p>Examples:<\/p>\n<ul>\n<li>Thickness below specification<\/li>\n<li>Incorrect length<\/li>\n<li>Incorrect diameter<\/li>\n<li>Excessive tolerance deviation<\/li>\n<\/ul>\n<p>For industrial projects, dimensional accuracy can be critical.<\/p>\n<h3>5. Material Certificates and Quality Documents<\/h3>\n<p>Steel buyers often rely on documents provided by suppliers.<\/p>\n<p>Common documents include:<\/p>\n<ul>\n<li>Mill Test Certificate (MTC)<\/li>\n<li>Certificate of Analysis<\/li>\n<li>Inspection Certificate<\/li>\n<li>Quality Certificate<\/li>\n<li>Packing List<\/li>\n<li>Export documents<\/li>\n<\/ul>\n<p>A dispute may arise if:<\/p>\n<ul>\n<li>Certificates do not match the delivered products<\/li>\n<li>Testing information is incomplete<\/li>\n<li>Documents appear inconsistent<\/li>\n<li>The supplier refuses to provide certificates<\/li>\n<\/ul>\n<p>If the buyer suspects document problems, independent testing may be necessary.<\/p>\n<h3>6. Independent Inspection and Laboratory Testing<\/h3>\n<p>Technical disputes should usually be supported by objective evidence.<\/p>\n<p>A foreign buyer may consider:<\/p>\n<ul>\n<li>Independent inspection companies<\/li>\n<li>Certified laboratories<\/li>\n<li>Metallurgical testing<\/li>\n<li>Chemical analysis<\/li>\n<li>Mechanical testing<\/li>\n<\/ul>\n<p>The inspection should determine:<\/p>\n<ul>\n<li>What products were delivered<\/li>\n<li>Whether the products match the contract<\/li>\n<li>What standards apply<\/li>\n<li>What defects exist<\/li>\n<li>Whether the products can be used<\/li>\n<li>The possible economic impact<\/li>\n<\/ul>\n<p>A professional inspection report can become important evidence during negotiation, arbitration, or litigation.<\/p>\n<h3>7. Can a Buyer Reject Steel Products from China?<\/h3>\n<p>Whether a buyer can reject delivered steel depends on:<\/p>\n<ul>\n<li>Contract terms<\/li>\n<li>Nature of the defect<\/li>\n<li>Timing of inspection<\/li>\n<li>Applicable law<\/li>\n<li>Whether the defect is material<\/li>\n<\/ul>\n<p>A buyer should carefully document the rejection.<\/p>\n<p>The buyer should avoid simply refusing the goods without explanation because the supplier may argue that the buyer breached the contract.<\/p>\n<p>A proper rejection notice should include:<\/p>\n<ul>\n<li>Contract information<\/li>\n<li>Product information<\/li>\n<li>Defects identified<\/li>\n<li>Inspection results<\/li>\n<li>Contractual basis<\/li>\n<li>Requested solution<\/li>\n<\/ul>\n<h3>8. Can the Buyer Request Replacement or Refund?<\/h3>\n<p>Possible remedies may include:<\/p>\n<ul>\n<li>Replacement of defective steel products<\/li>\n<li>Delivery of conforming goods<\/li>\n<li>Price reduction<\/li>\n<li>Refund<\/li>\n<li>Repair or reprocessing<\/li>\n<li>Compensation for losses<\/li>\n<\/ul>\n<p>The appropriate remedy depends on the commercial situation.<\/p>\n<p>For example:<\/p>\n<p>If the steel can still be used after minor processing, a price reduction may be practical.<\/p>\n<p>If the steel cannot be used for the intended project, replacement or refund may be necessary.<\/p>\n<h3>9. Supplier Claims That &#8220;The Steel Meets Industry Standards&#8221;<\/h3>\n<p>A common response from suppliers is:<\/p>\n<blockquote><p>&#8220;The products meet industry standards.&#8221;<\/p><\/blockquote>\n<p>However, this statement may not resolve the dispute.<\/p>\n<p>The issue is not only whether the steel meets a general industry standard.<\/p>\n<p>The issue is:<\/p>\n<p><strong>Does the steel meet the specific contractual requirements agreed between the parties?<\/strong><\/p>\n<p>A contract may require standards higher than general market standards.<\/p>\n<p>For example:<\/p>\n<ul>\n<li>Specific chemical composition<\/li>\n<li>Special testing requirements<\/li>\n<li>Customer approval<\/li>\n<li>Project-specific specifications<\/li>\n<\/ul>\n<h3>10. Supplier Delivered Alternative Materials Without Approval<\/h3>\n<p>Some suppliers replace materials because:<\/p>\n<ul>\n<li>The original material is unavailable<\/li>\n<li>The alternative material is cheaper<\/li>\n<li>Production conditions changed<\/li>\n<\/ul>\n<p>However, unauthorized substitution can create serious problems.<\/p>\n<p>The buyer should compare:<\/p>\n<ul>\n<li>Contract specifications<\/li>\n<li>Purchase order<\/li>\n<li>Material certificates<\/li>\n<li>Actual delivered products<\/li>\n<\/ul>\n<p>A supplier generally should not unilaterally change important material specifications without buyer approval.<\/p>\n<h3>11. Payment Disputes in Steel Transactions<\/h3>\n<p>Steel purchases often involve significant advance payments.<\/p>\n<p>Common payment structures include:<\/p>\n<ul>\n<li>Deposit before production<\/li>\n<li>Balance before shipment<\/li>\n<li>Letter of credit<\/li>\n<li>Payment after inspection<\/li>\n<\/ul>\n<p>Problems may arise when:<\/p>\n<ul>\n<li>Buyer refuses final payment due to defects<\/li>\n<li>Supplier refuses shipment after receiving deposit<\/li>\n<li>Supplier demands additional payment<\/li>\n<li>Buyer requests refund<\/li>\n<\/ul>\n<p>The parties should carefully review:<\/p>\n<ul>\n<li>Payment terms<\/li>\n<li>Inspection conditions<\/li>\n<li>Transfer of ownership<\/li>\n<li>Risk of loss<\/li>\n<li>Contractual remedies<\/li>\n<\/ul>\n<p>Stopping payment without legal analysis may create additional risks.<\/p>\n<h3>12. Delayed Delivery of Steel Products<\/h3>\n<p>Steel projects often depend on strict delivery schedules.<\/p>\n<p>A delay may cause:<\/p>\n<ul>\n<li>Production interruption<\/li>\n<li>Construction delays<\/li>\n<li>Customer claims<\/li>\n<li>Additional purchasing costs<\/li>\n<\/ul>\n<p>The buyer should examine:<\/p>\n<ul>\n<li>Contract delivery date<\/li>\n<li>Shipping terms<\/li>\n<li>Delay responsibility<\/li>\n<li>Liquidated damages clause<\/li>\n<\/ul>\n<p>If the supplier delays delivery without valid contractual justification, the buyer may have a claim.<\/p>\n<h3>13. Preserving Evidence in a Steel Dispute<\/h3>\n<p>Evidence is critical.<\/p>\n<p>Foreign buyers should preserve:<\/p>\n<h3>Contract evidence<\/h3>\n<ul>\n<li>Purchase agreement<\/li>\n<li>Purchase order<\/li>\n<li>Quotations<\/li>\n<li>Invoices<\/li>\n<\/ul>\n<h3>Technical evidence<\/h3>\n<ul>\n<li>Specifications<\/li>\n<li>Drawings<\/li>\n<li>Standards<\/li>\n<li>Test reports<\/li>\n<li>Inspection reports<\/li>\n<\/ul>\n<h3>Product evidence<\/h3>\n<ul>\n<li>Photos<\/li>\n<li>Videos<\/li>\n<li>Labels<\/li>\n<li>Packaging<\/li>\n<li>Serial numbers<\/li>\n<li>Steel markings<\/li>\n<\/ul>\n<h3>Communication evidence<\/h3>\n<ul>\n<li>Email<\/li>\n<li>WeChat<\/li>\n<li>WhatsApp<\/li>\n<li>Supplier statements<\/li>\n<\/ul>\n<h3>Loss evidence<\/h3>\n<ul>\n<li>Replacement purchase costs<\/li>\n<li>Testing fees<\/li>\n<li>Storage costs<\/li>\n<li>Project delay costs<\/li>\n<\/ul>\n<p>Evidence should be collected before the products are modified, processed, or used.<\/p>\n<h3>14. Sending a Formal Demand Letter to the Chinese Supplier<\/h3>\n<p>If negotiation fails, a formal demand letter may be appropriate.<\/p>\n<p>The letter should clearly explain:<\/p>\n<ul>\n<li>Contract details<\/li>\n<li>Supplier obligations<\/li>\n<li>Non-conforming products<\/li>\n<li>Evidence<\/li>\n<li>Legal basis<\/li>\n<li>Required remedy<\/li>\n<li>Deadline for response<\/li>\n<\/ul>\n<p>Possible demands include:<\/p>\n<ul>\n<li>Replacement<\/li>\n<li>Refund<\/li>\n<li>Price reduction<\/li>\n<li>Compensation<\/li>\n<li>Delivery of missing documents<\/li>\n<li>Withdrawal of defective products<\/li>\n<\/ul>\n<p>A professional demand letter can demonstrate that the buyer is prepared to take formal action.<\/p>\n<h3>15. Negotiation Before Litigation<\/h3>\n<p>Many China steel disputes are resolved through negotiation.<\/p>\n<p>Possible solutions include:<\/p>\n<ul>\n<li>Replacement shipment<\/li>\n<li>Partial refund<\/li>\n<li>Price discount<\/li>\n<li>Additional inspection<\/li>\n<li>Future order credit<\/li>\n<li>Return of goods<\/li>\n<\/ul>\n<p>However, any settlement should be documented in writing.<\/p>\n<p>Verbal promises are difficult to enforce.<\/p>\n<h3>16. Chinese Litigation or Arbitration<\/h3>\n<p>If the supplier refuses to resolve the dispute, the buyer may consider legal action.<\/p>\n<p>Possible options include:<\/p>\n<ul>\n<li>Chinese court litigation<\/li>\n<li>Arbitration<\/li>\n<li>Enforcement proceedings<\/li>\n<\/ul>\n<p>The correct approach depends on:<\/p>\n<ul>\n<li>Contract dispute clause<\/li>\n<li>Governing law<\/li>\n<li>Supplier location<\/li>\n<li>Value of the claim<\/li>\n<li>Evidence available<\/li>\n<\/ul>\n<p>If the supplier&#8217;s assets are located in China, obtaining an enforceable Chinese judgment or arbitral award may be important.<\/p>\n<h3>17. Investigating the Supplier Before Taking Action<\/h3>\n<p>Before investing substantial legal costs, buyers should consider:<\/p>\n<ul>\n<li>Company registration information<\/li>\n<li>Business status<\/li>\n<li>Litigation history<\/li>\n<li>Enforcement records<\/li>\n<li>Factory ownership<\/li>\n<li>Assets<\/li>\n<li>Ability to satisfy a judgment<\/li>\n<\/ul>\n<p>Winning a dispute is only useful if the buyer can actually recover money.<\/p>\n<h3>18. Common Mistakes Made by Foreign Steel Buyers<\/h3>\n<p>Foreign buyers often make mistakes such as:<\/p>\n<h3>Relying only on verbal promises<\/h3>\n<p>Important specifications should be written into the contract.<\/p>\n<h3>Accepting defective goods without reservation<\/h3>\n<p>Acceptance may affect later claims.<\/p>\n<h3>Discarding defective materials<\/h3>\n<p>The products may become important evidence.<\/p>\n<h3>Waiting too long<\/h3>\n<p>Delay may weaken evidence and negotiation leverage.<\/p>\n<h3>Focusing only on product quality<\/h3>\n<p>The dispute may also involve payment, delivery, inspection, and contract interpretation.<\/p>\n<h3>19. Practical Strategy for Foreign Buyers<\/h3>\n<p>A practical response process may include:<\/p>\n<h3>Step 1<\/h3>\n<p>Collect all contracts and technical documents.<\/p>\n<h3>Step 2<\/h3>\n<p>Compare delivered products with contractual requirements.<\/p>\n<h3>Step 3<\/h3>\n<p>Arrange independent inspection if necessary.<\/p>\n<h3>Step 4<\/h3>\n<p>Preserve all evidence.<\/p>\n<h3>Step 5<\/h3>\n<p>Calculate losses.<\/p>\n<h3>Step 6<\/h3>\n<p>Send a formal demand letter.<\/p>\n<h3>Step 7<\/h3>\n<p>Negotiate a commercial solution.<\/p>\n<h3>Step 8<\/h3>\n<p>Consider arbitration or litigation if necessary.<\/p>\n<h3>Conclusion<\/h3>\n<p>A China steel supplier dispute is often not simply about defective products.<\/p>\n<p>The core issue is whether the supplier delivered products that complied with the contractual requirements.<\/p>\n<p>Foreign buyers should carefully review:<\/p>\n<ul>\n<li>Contract terms<\/li>\n<li>Technical specifications<\/li>\n<li>Quality standards<\/li>\n<li>Inspection records<\/li>\n<li>Material certificates<\/li>\n<li>Delivery obligations<\/li>\n<li>Payment conditions<\/li>\n<\/ul>\n<p>When a Chinese steel supplier delivers non-conforming products, possible remedies may include replacement, refund, price reduction, damages, negotiation, arbitration, or litigation.<\/p>\n<p>The earlier a buyer preserves evidence and evaluates its legal position, the stronger its ability to protect its commercial interests.<\/p>\n<p>For foreign companies purchasing steel products from China, careful contract drafting and early legal assessment can significantly reduce the risks associated with supplier disputes.<\/p>\n<p><!-- BCL_CITY_MIDDLE_START --><\/p>\n<section class=\"bcl-city-context\">\n<h3>Checking a Ningbo Supplier Before a Dispute<\/h3>\n<p>The local market includes businesses active in machinery, electrical equipment, household products and export manufacturing. Depending on the transaction, relevant issues may include OEM disputes, quality claims, shipping-related disputes, delivery delays and payment disputes. For export transactions connected with Ningbo, buyers should pay particular attention to the contracting entity, product specifications, inspection evidence, shipping arrangements, delivery terms and the allocation of responsibilities under the sales contract.<\/p>\n<p>For a cross-border transaction, the buyer should keep the supplier\u2019s Chinese legal name, registration information, contract, invoices, bank-payment records and communications together. Ningbo forms part of Zhejiang and its commercial network includes a major export ecosystem connected to international shipping and manufacturing supply chains.<\/p>\n<\/section>\n<p><!-- BCL_CITY_MIDDLE_END --><\/p>\n<p><!-- BCL_CITY_CLOSING_START --><\/p>\n<section class=\"bcl-city-closing\">\n<h3>Evidence and Contract Review for Ningbo Transactions<\/h3>\n<p>If a dispute develops, evidence should be preserved before important communications or negotiations change the factual record. The relevant documents may include the contract, purchase orders, specifications, inspection records, invoices, payment records, shipping documents and correspondence.<\/p>\n<\/section>\n<p><!-- BCL_CITY_CLOSING_END --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Supplier verification is particularly important for overseas buyers dealing with companies in Ningbo. Ningbo is a major port and manufacturing center with extensive export-oriented industrial&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26],"tags":[],"class_list":["post-1328","post","type-post","status-publish","format-standard","hentry","category-china-building-materials-supplier-dispute-lawyers"],"_links":{"self":[{"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/posts\/1328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/comments?post=1328"}],"version-history":[{"count":0,"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/posts\/1328\/revisions"}],"wp:attachment":[{"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/media?parent=1328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/categories?post=1328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lyuandassociates.com\/ningbo\/wp-json\/wp\/v2\/tags?post=1328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}